image

Purchase of Raw Material.

First step of production is to purchase the raw material (Brass Rods) form our trusted and verified supplier.Material are to be purchased as per the standard material grade or customer's specification as below.


Free Cuttings 319/89 Grade-1, IS 319/89-Grade-2, IS 319/89 Grade-3,BS 2874-cz 121 Pb3, EN 12164:1998 , DIN 17660

Forging Brass RodsBS 218, DIN 17660, IS - 6912/2005 FLB,IS-8737.

Leaded Free Brass for Sections BS 2874-CZ 130,IS 4170/67-CuZn40,IS 4413/81-CuZn37

Riveting Brass Wires(Leaded) IS 2704/83-Cunz35pb1.

Naval Brass Rods IS 291/89 Grade 1, IS 291/89 Grade 2

Quality Checking of Material.

Before Start a production it is very essential to verify material grade report provided by supplier.In this process technician(Quality Supervisor) is responsible to verify the material grade and also confirm that everything is as per customer's specifications.Once got approval from quality supervisor material send for the further manufacturing process


Also we are able to produce any kind of customized Brass product.

Manufacturing.

Here in this step manufacturing process are likely to be Threading,Drilling,Facing,milling and cutting.In this process expert engineers are responsible for taking care of measurement,dimensions and quality checking of products.


Our experienced & expert engineers has been producingin tolerance between A+0.02 mm to A+0.05 mm and also it may in micron

Quality Control Department.

After product is produced,it has been sent to QC Department,Quality Control Supervisor will check all dimensions and Measurements on the basis of various quality checking methods i.e.statistical quality control (SQC),Simple Random and Systematic Random Sampling Methods,Statistical Process Control (SPC) etc., and generates the report. If reports are under required tolerance then material will send to packing department otherwise it will send for reproducing process.


Packing.

Within the scope of picking each order or suborder are directed to a particular packing location. The completeness of whole order can be checked here optionally. Than the packing list gets printed to be included into the packing and the whole order is packed.